RAILWAY BRANCH (5 km) OF THE MULTIMODAL CENTER OF PARMA - CEPIM – ITALY

  • Print

COMMITMENT: Snamprogetti S.p.a. (ENI Group)

DATE: The engineering services took place in the period 2005-2009 in n.4 different phases:

  • from 2005 to 2006: enlargement of the existing Terminal
  • from 2006 to 2007: new Terminal for Container inside the multimodal center of Parma
  • from 2007 to 2008: improvement and development of railway connections and of the poles along the corridor TI-BRE (TIrreno-BREnnero)
  • from 2008 to 2009: action of technological adaptation (Electric Traction, Electric Signaling and Telecommunications) and functional adaptation from the Castelguelfo station (Milan-Bologna line) to the multimodal center of Parma (5 km).

PROJECT VALUE: € 60 millions.

TYPE OF WORK: Feasibility, Basic Design, Final Design

 

DESCRIPTION OF THE ACTIVITIES AND RESPONSIBILITY:

  • Definition of the railway lay-out and sizing of the new yards; verification of the correct running of the trains; planning of new means for the container handling; planning of new road network to support the traffic inside the yards.

  • Definition of the action to modify the electrical equipment of the Castelguelfo station; electrification plan of the railway branch and of the new railway marshalling yard; Signaling and Telecommunications modification of the railway line and of the yards.

  • Railway transport analysis along the corridor La Spezia Port – Parma – Verona Multimodal Center; simulation of the railway service with the target to verify the running impacts on the existing railway “Pontremolese” line and choice of optimal compositions of trains.

RAILWAY BRANCH (5 km) OF THE MULTIMODAL CENTER OF PARMA - CEPIM – ITALY